Shanghai Rome Art Paint Co.,Ltd

+86 13062758269
Sport Flooring  Materials
Air Permeable Plastic Runway
分享到:
Air Permeable Plastic Runway
Product Details

Plastic track

         Plastic runway is the most innovative and technological high-level runway surface system nowadays. It is specially designed fro the strength and safety of athletes. It is based on high purity polyurethane resin and has very low toxic volatile gas. It is an environmentally friendly material with lasting safety performance. It has excellent anti-ultraviolet ability and color, bright and lasting.

塑胶跑道结构图02.png

Brief introduction of breathable plastic runway

Permeable plastic runway, also known as deep-water runway, has been widely adopted in rainy areas because of its good permeability and water permeability. Permeable plastic runway is one of the main products of plastic runway surface, which has the advantages and performance of general runway volume and low cost. Our company's air-permeable plastic runway is generally paved by professional paver, the smoothness is effectively controlled, and the upper layer is sprayed by professional spraying machine, the content of polyurethane glue is very high, so the fastness of the surface layer is relatively large compared with other types of runway, and there is little need for maintenance during use. Reduce maintenance cost greatly.


Characteristics of air permeable plastic runway

The bottom layer of breathable plastic runway material is a combination of single component glue and elastic rubber particles. It is an environmentally friendly product with breathable function. A high temperature, the steam generated by the foundation will quickly emit, and the steam pressure can not gather, so there will be no bubbling phenomenon, which meets the professional requirements and has good elasticity.


1. EPDM (ethylene propylene trioxide) colloidal particles are used in the surface layer to make it have high ultraviolet resistance. Practice has proved that it has no fading and strong wear resistance.

2. The EPDM (ethylene propylene trioxide) colloidal particles on the surface layer are mixed with polyurethane slurry and prepolymer, and then sprayed mechanically.

3. Excellent weather resistance, not easy to aging.

4. The elasticity is stable. There is no difference in elasticity throughout the year. It will not be hard in winter or soft in summer.

5. Strength rotation and strong shock absorption, emphasizing the comfort and safety of athletes. To help athletes develop or improve their performance.

6. Emphasizing the overall performance of the runway, adapting to various items and long-term competition training, etc.

7. Painting line is not easy to drop paint, bright color, non-fading, better wear resistance.

8. The flatness meets the IAAF standard. The green water is good. There is no need to stop the race in light rainy days. The race can be held immediately after heavy rains, and there will be no water accumulation.


Scope of application of breathable plastic runway

International competition, national competition venue, professional sports school training and teaching venue, general school teaching venue, professional gymnasium, multi-functional stadium.


Requirements for Foundation of Air-permeable Plastic Runway

Cement concrete foundation can be used in permeable plastic runway, and the foundation should have certain strength and stability. Cracks and uneven frost heave caused by freezing can not be found or produced, and cushion should be added in strata with high water content. In cold areas, foundation should be thickened according to local geological conditions or anti-frost heave measures should be taken. Generally, the thickness of cement concrete is about 120-150mm, the flatness of cement concrete requires that the error of 3-meter ruler should not exceed 3mm, and the strength should be above C20. The slope of the surface should be 6-10% from the outer edge of the runway to the inner edge (drainage ditch). It is suggested that 8% should be achieved. Cement concrete should not exceed 6 meters a day for cutting joints. It is suggested that 4-5 meters for cutting joints. The maintenance period of cement concrete should be 28 days according to the standard maintenance period, in the case of poor leveling. It is strictly forbidden to use pure cement mortar for one-layer skin leveling.


Construction Technology of Permeable Plastic Runway

1. Apply one-component glue or undercoat uniformly to cement foundation by rolling brush.

2. Before the undercoat is solidified, the mono-component glue and EPDM particles are distributed in a prescribed proportion, fully stirred by a mixer and transported to the paving site. The paver is paved according to the prescribed thickness. After solidification, it becomes an elastic layer.

3. Mix the permeable spraying adhesive with EPDM paritcles and EPDM powder in theprescribed proportion evenly and pour it into the special spraying machine. Spray it clockwise and counter-clockwise twice to three times. After curing, it is anti-skid and wear-resistant layer. Now the commonly used color is red and green.

4. Line according to competition rules or user requirements.

11.jpg




Add:11L, No. 8519, Nanfeng Road, Fengxian District, Shanghai
Tel:+86 13482793679    +86 13062758269
E-Mail: linguixiang@ybldp.com
      mura@ybldp.com


+86 13482793679
Shanghai Rome Art Print Co., Ltd